Young Antoni Gaudí photographed by Pau Audouard in 1878.

Antoni Gaudí

Builder of Living Geometry

He turned structure, craft and light into rooms that feel grown as carefully as they were built.

Structural Experiment
Tests curves and loads with models and hanging chains.
Craft Orchestra
Brings ceramic, stone and ironwork into the whole design.
Daylight Weaver
Shapes shafts and surfaces to distribute light.

Antoni Gaudí

Architect & Designer

Start hereCasa BatllóThe remodeled building joins a light well, ventilation, stair and street façade into a vivid domestic system.Explore the building

Gaudí’s curves were worked out with materials and forces, not drawn as mere decoration. A stair admits daylight, a roof sheds water, a column divides its load like a branching tree. His Barcelona buildings reward looking at how they function before naming what they resemble.

1852–1883

Craft and a city in growth

Gaudí was born in Catalonia and trained in Barcelona, a city expanding beyond its old walls. Family experience with metalworking and his architectural education sharpened his attention to things made by hand. Early commissions such as Casa Vicens allowed him to test tile, brick and iron in a new domestic language.

He entered the Sagrada Família project in 1883, replacing its original architect Francisco de Paula del Villar. It was not yet the single life’s work of popular memory: for decades Gaudí balanced it with houses, a park and buildings for other patrons.

Casa VicensCeramic tile, brick and a garden commission show the young architect testing pattern and material.Explore the building
1883–1900

Patrons, workshops and load

Textile industrialist Eusebi Güell became an important patron, giving Gaudí scope for the Palau Güell and later the church at Colònia Güell. Structural problems encouraged him to use hanging-chain models: turn the suspended curve upside down and it suggests a compressive arch. Such models let construction logic shape the visible form.

The buildings were made with masons, carpenters, ceramicists and ironworkers whose decisions translated models into usable rooms. Gaudí’s authorship is real, but the handcraft that makes it palpable was collaborative.

1900–1906

A park and a remodeled house

Park Güell began as a planned private housing development on hilly land; the real-estate scheme did not succeed, and the site later became a public park. Gaudí’s roads, viaducts and retaining walls follow the terrain, while mosaic surfaces gather fragments into a new whole. It is landscape design as much as architecture.

For the Batlló family, he transformed an existing city house rather than beginning from empty ground. The façade’s shifting surfaces are memorable, but the light well, stair and ventilation are equally important. Tiles grade from pale to dark to help distribute daylight down the shaft; the design is a practical negotiation with a narrow urban lot.

Casa BatllóThe remodeled building joins a light well, ventilation, stair and street façade into a vivid domestic system.Explore the building
Casa Batlló’s remodeled façade on Passeig de Gràcia.
1906–1914

La Pedrera’s moving surface

Casa Milà’s limestone façade rolls along the street, but the building’s innovation is also behind it: two courtyards bring air and daylight inward, and its structural system allows unusually flexible apartments. The roof turns chimneys and ventilation towers into a visible landscape of service elements.

In these years Gaudí refined the Sagrada Família through large models and workshop trials. The basilica was funded by donations, so construction moved unevenly. Its ambition grew through revision; the building visible today contains later decisions, not a complete set of instructions left by one man.

Casa Milà / La PedreraWalk from the undulating façade to the courtyards and roof to see structure, light and circulation working together.Explore the building
1914–1926

The unfinished basilica

Gaudí devoted his final years almost entirely to the Sagrada Família. Branching columns and ruled surfaces distribute loads while letting light enter from many directions. The Nativity façade and one tower were the principal portions finished in his lifetime. Its construction continued after his death, with interruptions, lost workshop material and work by later architects and craftspeople.

He died in 1926 after being struck by a tram. The unfinished church has become a place to ask what it means to continue an architect’s project: conservation, interpretation and new building are intertwined. The most useful way into it is to compare what Gaudí built and modeled with what later generations have made.

Sagrada FamíliaCompare the Nativity façade and the branching interior structure, while keeping later architects’ work distinct from Gaudí’s own.Explore the building
Branching columns and vaults inside the Sagrada Família.